Aid Worksheets
All general aid worksheet files are in Microsoft Word, Excel or Adobe PDF format:
- 2024-2025 Reports
- 2023-2024 Reports
- 2022-2023 Reports
- 2021-2022 Reports
- 2020-2021 Reports
- 2019-2020 Reports
- 2018-2019 Reports
- 2017-2018 Reports
- 2016-2017 Reports
- 2015-2016 Reports
- 2014-2015 Reports
- 2013-2014 Reports
- 2012-2013 Reports
- 2011-2012 Reports
- 2010-2011 Reports
- 2009-2010 Reports
- 2008-2009 Reports
- 2007-2008 Reports
2024-2025 Reports
2024-25 October 15 Certification of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $11,943 | $2,207,144 | $975,802 |
UHS | $1,000 | $5,790,000 | $11,943 | $6,621,432 | $2,927,406 |
PK-8 | $1,000 | $2,895,000 | $11,943 | $3,310,716 | $1,463,703 |
- Deduction for Milwaukee Charter School Program for all districts is $0, per Joint Finance Committee, 6/2021
- No deduction for Milwaukee Parental School Choice Program
2024-2025 October 15 Certification of General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2024-25 October 15 Certification Worksheet
- October 15 Certification Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2023-24 FTE Membership Used for 2024-25 General Aid
- 2023-24 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports, and select FY 2023-2024 Aid Calc FTE - calculation for 2024-25 General Aid.
2024-25 July 1 Estimate of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $11,959 | $2,218,770 | $977,295 |
UHS | $1,000 | $5,790,000 | $11,959 | $6,656,310 | $2,931,885 |
PK-8 | $1,000 | $2,895,000 | $11,959 | $3,328,155 | $1,465,942 |
- Deduction for Milwaukee Charter School Program for all districts: $0, per JFC
- No deduction for Milwaukee Parental School Choice Program
2024-25 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2024-25 July 1 Estimate Worksheet
- July 1 Estimate Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2023-24 FTE Membership Used for 2024-25 General Aid
- 2023-2024 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2023-2024 Aid Calc FTE - Data used to calculate aid paid in the 2024-2025 fiscal year.
2023-2024 Reports
2023-24 Final General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $11,103 | $2,031,841 | $861,640 |
UHS | $1,000 | $5,790,000 | $11,103 | $6,095,523 | $2,584,920 |
PK-8 | $1,000 | $2,895,000 | $11,103 | $3,047,761 | $1,292,460 |
- Deduction for Milwaukee Charter School Program for all districts: $0, per JFC
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2023-2024 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
2023-24 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By law, the 2023-24 October-to-Final Aid Adjustments are added to or subtracted from your district's 2024-25 September equalization aid payment (payment date is September 16, 2024) and will be incorporated into the October 15, 2024, General Aid Certification. The adjustments are considered 2024-25 revenue.
2023-24 October 15 Certification of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $11,194 | $1,984,342 | $861,627 |
UHS | $1,000 | $5,790,000 | $11,194 | $5,953,026 | $2,584,881 |
PK-8 | $1,000 | $2,895,000 | $11,194 | $2,976,513 | $1,292,440 |
- Deduction for Milwaukee Charter School Program for all districts is $0, per Joint Finance Committee, 6/2021
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2023-2024 October 15 Certification of General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2023-24 October 15 Certification Worksheet
- October 15 Certification Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2022-23 FTE Membership Used for 2023-24 General Aid
- 2022-23 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2022-2023 Aid Calc FTE - calculation for 2023-24 General Aid.
2023-24 July 1 Estimate of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $11,210 | $2,006,079 | $861,630 |
UHS | $1,000 | $5,790,000 | $11,210 | $6,018,237 | $2,584,890 |
PK-8 | $1,000 | $2,895,000 | $11,210 | $3,009,118 | $1,292,445 |
- Deduction for Milwaukee Charter School Program for all districts is $0, per Joint Finance Committee, 6/2021
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2023-2024 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2023-24 July 1st Estimate Worksheet
- July 1 Estimate Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2022-23 FTE Membership Used for 2023-24 General Aid
- 2022-23 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2022-2023 Aid Calc FTE - calculation for 2023-24 General Aid.
2022-2023 Reports
2022-23 Final General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $10,951 | $1,681,045 | $754,860 |
UHS | $1,000 | $5,790,000 | $10,951 | $5,043,135 | $2,264,580 |
PK-8 | $1,000 | $2,895,000 | $10,951 | $2,521,567 | $1,132,290 |
- Deduction for Milwaukee Charter School Program for all districts is 0, per Act 58.
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2022-23 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
2022-23 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By law, the 2022-23 October-to-Final Aid Adjustments are added to or subtracted from your district's 2023-24 September equalization aid payment (payment date is September 18, 2023) and will be incorporated into the October 15, 2023 General Aid Certification. The adjustments are considered 2023-24 revenue.
2022-23 October 15 Certification of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $10,832 | $1,722,650 | $754,823 |
UHS | $1,000 | $5,790,000 | $10,832 | $5,167,950 | $2,264,469 |
PK-8 | $1,000 | $2,895,000 | $10,832 | $2,583,975 | $1,132,234 |
- Deduction for Milwaukee Charter School Program for all districts is $0, per Joint Finance Committee, 6/2021
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2022-2023 October 15 Certification of General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2022-23 October 15 Certification Worksheet
- October 15 Certification Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2021-22 FTE Membership Used for 2022-23 General Aid
- 2021-22 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2021-2022 Aid Calc FTE - calculation for 2022-23 General Aid.
2022-23 July 1 Estimate of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $11,005 | $1,680,549 | $755,033 |
UHS | $1,000 | $5,790,000 | $11,005 | $5,041,647 | $2,265,099 |
PK-8 | $1,000 | $2,895,000 | $11,005 | $2,520,823 | $1,132,549 |
- Deduction for Milwaukee Charter School Program for all districts is $0, per Joint Finance Committee, 6/2021
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2022-2023 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2022-23 July 1st Estimate Worksheet
- July 1 Estimate Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2021-22 FTE Membership Used for 2022-23 General Aid
- 2021-22 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2021-2022 Aid Calc FTE - calculation for 2022-23 General Aid.
2021-2022 Reports
2021-22 Final General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $10,760 | $1,567,708 | $715,267 |
UHS | $1,000 | $5,790,000 | $10,760 | $4,703,124 | $2,145,801 |
PK-8 | $1,000 | $2,895,000 | $10,760 | $2,351,562 | $1,072,900 |
- Deduction for Milwaukee Charter School Program for all districts is 0, per Act 58.
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2021-22 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
2021-22 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By law, the 2021-22 October-to-Final Aid Adjustments are added to or subtracted from your district's 2022-23 September equalization aid payment (payment date is September 19, 2022) and will be incorporated into the October 15, 2022 General Aid Certification. The adjustments are considered 2022-23 revenue.
2021-22 October 15 Certification of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $10,771 | $1,563,771 | $715,267 |
UHS | $1,000 | $5,790,000 | $10,771 | $4,691,133 | $2,145,801 |
PK-8 | $1,000 | $2,895,000 | $10,771 | $2,345,566 | $1,072,900 |
- Deduction for Milwaukee Charter School Program for all districts is $0, per Act 58.
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2021-2022 October 15 Certification General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2021-22 October 15 Certification Worksheet
- October 15 Certification Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2020-21 FTE Membership Used for 2021-22 General Aid
- 2020-21 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2020-2021 Aid Calc FTE - calculation for 2021-22 General Aid.
2021-22 July 1 Estimate of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $11,067 | $1,508,774 | $715,289 |
UHS | $1,000 | $5,790,000 | $11,067 | $4,526,322 | $2,145,867 |
PK-8 | $1,000 | $2,895,000 | $11,067 | $2,263,161 | $1,072,933 |
- Deduction for Milwaukee Charter School Program for all districts is $0, per Joint Finance Committee, 6/2021
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2021-2022 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2021-22 July 1st Estimate Worksheet
- July 1 Estimate Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2020-21 FTE Membership Used for 2021-22 General Aid
- 2020-21 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2020-2021 Aid Calc FTE - calculation for 2021-22 General Aid.
2020-2021 Reports
2020-21 Final General Aid - State Cost Ceilings and Guarantees
The 2020-21 Final General Aid amounts and 2020-21 October-to-Final Aid Adjustments appear below.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $10,030 | $1,451,991 | $656,434 |
UHS | $1,000 | $5,790,000 | $10,030 | $4,355,973 | $1,969,302 |
PK-8 | $1,000 | $2,895,000 | $10,030 | $2,177,986 | $984,651 |
- Deduction for Milwaukee Charter School Program for all districts: -0.01617299934
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2020-21 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
2020-21 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By law, the 2020-21 October-to-Final Aid Adjustments are added to or subtracted from your district's 2021-22 September equalization aid payment (payment date is September 20, 2021) and will be incorporated into the October 15, 2021 General Aid Certification. The adjustments are considered 2021-22 revenue.
The 2020-21 October 15 Certification of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $10,030 | $1,451,514 | $656,434 |
UHS | $1,000 | $5,790,000 | $10,030 | $4,354,542 | $1,969,302 |
PK-8 | $1,000 | $2,895,000 | $10,030 | $2,177,271 | $984,651 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0161729997
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2020-2021 October 15 Certification of General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2020-21 October 15 Certification Worksheet
- October 15 Certification Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2019-20 FTE Membership Used for 2020-21 General Aid
- 2019-20 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2019-2020 Aid Calc FTE - calculation for 2020-21 General Aid.
The 2020-21 July 1 Estimate of General Aid - State Cost Ceilings and Guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $10,280 | $1,408,255 | $656,435 |
UHS | $1,000 | $5,790,000 | $10,280 | $4,224,765 | $1,969,305 |
PK-8 | $1,000 | $2,895,000 | $10,280 | $2,112,382 | $984,652 |
- Deduction for Milwaukee Charter School Program for all districts: -0.016943283
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2020-2021 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H and I on the 2020-21 July 1st Estimate Worksheet
- July 1 Estimate Blank Executable Worksheet - Districts can use this Excel file to enter in their own data and the file computes the results.
2019-20 FTE Membership Used for 2020-21 General Aid
- 2019-20 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2019-2020 Aid Calc FTE - calculation for 2020-21 General Aid.
2019-2020 Reports
2019-20 Final General Aid - State Cost Ceilings and Guarantees
The 2019-20 Final General Aid amounts and 2019-20 October-to-Final Aid Adjustments appear below. By law, the 2019-20 October-to-Final Aid Adjustments are added to or subtracted from your district's 2020-21 September equalization aid payment (payment date is September 21, 2020) and will be incorporated into the October 15, 2020 General Aid Certification. The adjustments are considered 2020-21 revenue.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,781 | $1,329,871 | $621,431 |
UHS | $1,000 | $5,790,000 | $9,781 | $3,989,613 | $1,864,293 |
PK-8 | $1,000 | $2,895,000 | $9,781 | $1,994,806 | $932,146 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0159069129
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2019-20 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
2018-19 FTE Membership Used for 2019-20 General Aid
- 2018-19 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2018-2019 Aid Calc FTE - calculation for 2019-20 General Aid.
2019-2020 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2019-20 Aid Adjustments are added to or subtracted from your district’s 2020-21 September equalization aid payment (payment date is September 21, 2020) and will be incorporated into the October 15, 2020 Certification of 2020-21 General Aid. The adjustments are considered 2020-21 revenue.
October 15th Certification of General Aid - State Cost Ceilings and Guarantees
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,782 | $1,329,139 | $621,416 |
UHS | $1,000 | $5,790,000 | $9,782 | $3,987,417 | $1,864,248 |
PK-8 | $1,000 | $2,895,000 | $9,782 | $1,993,708 | $932,124 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0159069119
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2019-2020 October 15th Certification of General Aid Worksheet
- October 15th Aid Certification Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H and I on the 2019-20 October 15th Aid Certification Worksheet
2018-2019 FTE Membership Used for 2019-20 General Aid
- 2018-19 FTE Report - This link takes you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2018-2019 Aid Calc FTE - calculation for 2019-20 General Aid.
July 1 Estimate of General Aid - State Cost Ceilings and Guarantees
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,973 | $1,299,413 | $621,410 |
UHS | $1,000 | $5,790,000 | $9,973 | $3,898,239 | $1,864,230 |
PK-8 | $1,000 | $2,895,000 | $9,973 | $1,949,119 | $932,115 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0160939349
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2019-2020 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H and I on the 2019-20 July 1st Estimate Worksheet
2018-2019 FTE Membership Used for 2019-20 General Aid
- 2018-19 FTE Report - This link takes you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2018-2019 Aid Calc FTE - calculation for 2019-20 General Aid.
2018-2019 Reports
Final 2018-19 General and Eligibility - State Cost Ceilings and Guarantees
The 2018-19 Final General Aid amounts and 2018-19 October-to-Final Aid Adjustments appear below. By law, the 2018-19 October-to-Final Aid Adjustments are added to or subtracted from your district's 2019-20 September equalization aid payment (payment date is September 16, 2019) and will be incorporated into the October 15, 2019 General Aid Certification. The adjustments are considered 2019-20 revenue.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,729 | $1,241,277 | $594,939 |
UHS | $1,000 | $5,790,000 | $9,729 | $3,723,831 | $1,784,817 |
PK-8 | $1,000 | $2,895,000 | $9,729 | $1,861,915 | $892,408 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0153535373
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2018-19 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
2017-18 FTE Membership Used for 2018-19 General Aid
- 2017-18 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2017-2018 Aid Calc FTE - calculation for 2018-19 General Aid.
2018-2019 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2018-19 Aid Adjustments are added to or subtracted from your district’s 2019-20 September equalization aid payment (payment date is September 16, 2019) and will be incorporated into the October 15, 2019 Certification of 2019-20 General Aid. The adjustments are considered 2019-20 revenue.
October 15th Certification of General Aid
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,729 | $1,241,233 | $594,939 |
UHS | $1,000 | $5,790,000 | $9,729 | $3,723,699 | $1,784,817 |
PK-8 | $1,000 | $2,895,000 | $9,729 | $1,861,849 | $892,408 |
- Deduction for Milwaukee Charter School Program for all districts: -0.015353554.
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools).
2018-2019 October 15 Certification of General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2018-19 October 15 Certification Worksheet
2017-2018 FTE Membership Used for 2018-19 General Aid
- 2017-18 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2017-2018 Aid Calc FTE - calculation for 2018-19 General Aid.
July 1 Estimate of General Aid - State Cost Ceilings and Guarantees
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,881 | $1,217,050 | $595,017 |
UHS | $1,000 | $5,790,000 | $9,881 | $3,651,150 | $1,785,051 |
PK-8 | $1,000 | $2,895,000 | $9,881 | $1,825,575 | $892,525 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0147996897
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2018-2019 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2018-19 July 1st Estimate Worksheet
2017-2018 FTE Membership Used for 2018-19 General Aid
- 2017-18 FTE Report - This link takes you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2017-2018 Aid Calc FTE - calculation for 2018-19 General Aid.
2017-2018 Reports
Final 2017-18 General and Eligibility - State Cost Ceilings and Guarantees
The 2017-18 Final General Aid amounts and 2017-18 October-to-Final Aid Adjustments appear below. By law, the 2017-18 October-to-Final Aid Adjustments are added to or subtracted from your district's 2018-19 September equalization aid payment (payment date is September 17, 2018) and will be incorporated into the October 15, 2018 General Aid Certification. The adjustments are considered 2018-19 revenue.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,618 | $1,173,281 | $573,441 |
UHS | $1,000 | $5,790,000 | $9,618 | $3,519,843 | $1,720,323 |
PK-8 | $1,000 | $2,895,000 | $9,618 | $1,759,921 | $860,161 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0143759137
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2017-18 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
2016-17 FTE Membership Used for 2017-18 General Aid
- 2016-17 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2016-2017 Aid Calc FTE - calculation for 2017-18 General Aid.
2017-2018 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2017-18 Aid Adjustments are added to or subtracted from your district’s 2018-19 September equalization aid payment (payment date is September 17, 2018) and will be incorporated into the October 15, 2018 Certification of 2018-19 General Aid. The adjustments are considered 2018-19 revenue.
October 15 Certification of General Aid - State Cost Ceilings and Guarantees
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,619 | $1,172,875 | $573,439 |
UHS | $1,000 | $5,790,000 | $9,619 | $3,518,625 | $1,720,317 |
PK-8 | $1,000 | $2,895,000 | $9,619 | $1,759,312 | $860,158 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0143759017
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2017-2018 October 15 Certification of General Aid Worksheet
- October 15 Aid Certification Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2017-18 October 15 Aid Certification Worksheet
2016-2017 FTE Membership Used for 2017-18 General Aid
- 2016-17 FTE Report - This link takes you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2016-2017 Aid Calc FTE - calculation for 2017-18 General Aid.
July 1 Estimate of General Aid - State Cost Ceilings and Guarantees
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,780 | $1,149,452 | $573,449 |
UHS | $1,000 | $5,790,000 | $9,780 | $3,448,356 | $1,720,347 |
PK-8 | $1,000 | $2,895,000 | $9,780 | $1,724,178 | $860,173 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0139346491
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2017-2018 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2017-18 July 1st Estimate Worksheet
2016-2017 FTE Membership Used for 2017-18 General Aid
- 2016-17 FTE Report - This link takes you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2016-2017 Aid Calc FTE - calculation for 2017-18 General Aid.
2016-2017 Reports
Final 2016-17 General and Eligibility - State Cost Ceilings and Guarantees
The 2016-17 Final General Aid amounts and 2016-17 October-to-Final Aid Adjustments appear below. By law, the 2016-17 October-to-Final Aid Adjustments are added to or subtracted from your district's 2017-18 September equalization aid payment (payment date is September 18, 2017) and will be incorporated into the October 15, 2017 General Aid Certification. The adjustments are considered 2017-18 revenue.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,538 | $1,146,928 | $558,545 |
UHS | $1,000 | $5,790,000 | $9,538 | $3,440,784 | $1,675,635 |
PK-8 | $1,000 | $2,895,000 | $9,538 | $1,675,635 | $837,817 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0135749133
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2016-17 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2016-17 Final General Aid Worksheet
2015-16 FTE Membership Used for 2016-17 General Aid
- 2015-16 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2015-2016 Aid Calc FTE - calculation for 2016-17 General Aid.
2016-2017 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2016-17 Aid Adjustments are added to or subtracted from your district’s 2017-18 September equalization aid payment (payment date is September 18, 2017) and will be incorporated into the October 15, 2017 Certification of 2017-18 General Aid. The adjustments are considered 2017-18 revenue.
October 15 Certification of General Aid
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,539 | $1,146,821 | $558,546 |
UHS | $1,000 | $5,790,000 | $9,539 | $3,440,463 | $1,675,638 |
PK-8 | $1,000 | $2,895,000 | $9,539 | $1,720,231 | $837,819 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0135749109
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2016-2017 October 15 Certification of General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2016-17 October 15 Certification
2015-2016 FTE Membership Used for 2016-17 General Aid
- 2015-16 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2015-2016 Aid Calc FTE - calculation for 2016-17 General Aid.
July 1 Estimate of General Aid - State Cost Ceilings and Guarantees
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,688 | $1,124,300 | $558,554 |
UHS | $1,000 | $5,790,000 | $9,688 | $3,372,900 | $1,675,662 |
PK-8 | $1,000 | $2,895,000 | $9,688 | $1,686,450 | $837,831 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0139321765
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2016-2017 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2016-17 July 1st Estimate Worksheet
2015-2016 FTE Membership Used for 2016-17 General Aid
- 2014-15 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2015-2016 Aid Calc FTE - calculation for 2016-17 General Aid.
2015-2016 Reports
Final 2015-16 General and Eligibility - State Cost Ceilings and Guarantees
The 2015-16 Final General Aid amounts and 2015-16 October-to-Final Aid Adjustments appear below. By law, the 2015-16 October-to-Final Aid Adjustments are added to or subtracted from your district's 2016-17 September equalization aid payment (payment date is September 19, 2016) and will be incorporated into the October 15, 2016 General Aid Certification. The adjustments are considered 2016-17 revenue.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,401 | $1,101,520 | $546,173 |
UHS | $1,000 | $5,790,000 | $9,401 | $3,304,560 | $1,638,519 |
PK-8 | $1,000 | $2,895,000 | $9,401 | $1,652,280 | $819,259 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0160643531
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2015-16 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2015-16 Final General Aid Worksheet
2014-15 FTE Membership Used for 2015-16 General Aid
- 2014-15 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2014-2015 Aid Calc FTE - calculation for 2015-16 General Aid.
2015-2016 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2015-16 Aid Adjustments are added to or subtracted from your district’s 2016-17 September equalization aid payment (payment date is September 19, 2016) and will be incorporated into the October 15, 2016 Certification of 2016-17 General Aid. The adjustments are considered 2016-17 revenue.
October 15 Certification of General Aid
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,400 | $1,101,448 | $546,173 |
UHS | $1,000 | $5,790,000 | $9,400 | $3,304,344 | $1,638,519 |
PK-8 | $1,000 | $2,895,000 | $9,400 | $1,652,172 | $819,259 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0160643573
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2015-2016 October 15 Certification of General Aid Worksheet
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2015-16 October 15 Certification Worksheet
2014-2015 FTE Membership Used for 2015-16 General Aid
- 2014-15 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2014-2015 Aid Calc FTE - calculation for 2014-15 General Aid.
July 1 Estimate of General Aid
State cost ceilings and guarantees (using the Joint Committee on Finance amendments to 2015 Senate/Assembly Bill 21 (2015-2017 Biennial Budget Bill).
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,534 | $1,083,469 | $546,174 |
UHS | $1,000 | $5,790,000 | $9,534 | $3,250,407 | $1,638,522 |
PK-8 | $1,000 | $2,895,000 | $9,534 | $1,625,203 | $819,261 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0162608655
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2015-2016 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pulldown menu to select district.
- Explanation of Lines H & I on the 2015-16 July 1st Estimate Worksheet
2014-2015 FTE Membership Used for 2015-16 General Aid
- 2014-15 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2014-2015 Aid Calc FTE - calculation for 2014-15 General Aid.
2014-2015 Reports
Final 2014-15 General and Eligibility - State Cost Ceilings and Guarantees
The 2014-15 Final General Aid amounts and 2014-15 October-to-Final Aid Adjustments appear below. By law, the 2014-15 October-to-Final Aid Adjustments are added to or subtracted from your district's 2015-16 September equalization aid payment (payment date is September 21, 2015) and will be incorporated into the October 15, 2015 General Aid Certification. The adjustments are considered 2015-16 revenue.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,227 | $1,096,664 | $531,951 |
UHS | $1,000 | $5,790,000 | $9,227 | $3,289,992 | $1,595,853 |
PK-8 | $1,000 | $2,895,000 | $9,227 | $1,644,996 | $797,926 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0153342971
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2014-15 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2014-15 Final General Aid Worksheet
2013-2014 FTE Membership Used for 2014-15 General Aid
- 2013-14 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2013-2014 Aid Calc FTE - calculation for 2014-15 General Aid.
2014-2015 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2014-15 Aid Adjustments are added to or subtracted from your district’s 2015-16 September equalization aid payment (payment date is September 21, 2015) and will be incorporated into the October 15, 2015 Certification of 2015-16 General Aid. The adjustments are considered 2015-16 revenue.
October 15 Certification of General Aid
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,225 | $1,096,593 | $531,883 |
UHS | $1,000 | $5,790,000 | $9,225 | $3,289,779 | $1,595,649 |
PK-8 | $1,000 | $2,895,000 | $9,225 | $1,644,889 | $797,824 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0153347035
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2014-2015 October 15 Certification of General Aid Worksheet
- October 15 General Aid Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2014-15 October 15 General Aid Certification Worksheet
2013-2014 FTE Membership Used for 2014-15 General Aid
- 2013-14 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2013-2014 Aid Calc FTE - calculation for 2014-15 General Aid.
July 1 Estimate of General Aid
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,391 | $1,071,201 | $531,888 |
UHS | $1,000 | $5,790,000 | $9,391 | $3,213,603 | $1,595,664 |
PK-8 | $1,000 | $2,895,000 | $9,391 | $1,606,801 | $797,832 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0155151115
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2014-2015 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2014-15 July 1st Estimate Worksheet
2013-2014 FTE Membership Used for 2014-15 General Aid
- 2013-14 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2013-2014 Aid Calc FTE - calculation for 2014-15 General Aid.
2013-2014 Reports
Rerun Final General and Eligibility - State Cost Ceilings and Guarantees
Note: Recently, it became necessary to re-run the 2013-14 Final General Aid computation in order to adjust the property value for 1 district. The result was a drop by $1 in the statewide tertiary guarantee and a drop of $4 in the statewide secondary guarantee. The 2013-14 October-to-Final Aid Adjustments were also recomputed.
The revised 2013-14 Final General Aid amounts and revised 2013-14 October-to-Final Aid Adjustments appear below. By law, the 2013-14 October-to-Final Aid Adjustments are added to or subtracted from your district's 2014-15 September equalization aid payment (payment date is September 15, 2014) and will be incorporated into the October 15, 2014 General Aid Certification. The adjustments are considered 2014-15 revenue.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,087 | $1,091,500 | $536,523 |
UHS | $1,000 | $5,790,000 | $9,087 | $3,274,500 | $1,609,569 |
PK-8 | $1,000 | $2,895,000 | $9,087 | $1,637,250 | $804,784 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0146504657
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2013-2014 Rerun Final General Aid Eligibility Worksheet (September 2, 2014)
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2013-14 Final General Aid Worksheet
2012-2013 FTE Membership Used for 2013-14 General Aid
- 2012-13 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2012-2013 Aid Calc FTE - calculation for 2013-14 General Aid.
2013-2014 Rerun General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2013-14 Aid Adjustments are added to or subtracted from your district’s 2014-15 September equalization aid payment (payment date is September 15, 2014) and will be incorporated into the October 15, 2014 Certification of 2014-15 General Aid. The adjustments are considered 2014-15 revenue.
October Certification of General Aid Wisconsin Act 46
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,092 | $1,090,654 | $536,519 |
UHS | $1,000 | $5,790,000 | $9,092 | $3,271,962 | $1,609,557 |
PK-8 | $1,000 | $2,895,000 | $9,092 | $1,635,981 | $804,778 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0146504949
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public School District)
2013 Wisconsin Act 46 October Certification of 2013-14 General Aid Worksheet
- 2013 WI Act 46 October Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2013-14 October Certification Worksheet
2012-2013 FTE Membership Used for 2013-14 General Aid
- 2012-13 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2012-2013 Aid Calc FTE - calculation for 2013-14 General Aid.
July 1 Estimate of General Aid
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,261 | $1,049,683 | $536,510 |
UHS | $1,000 | $5,790,000 | $9,261 | $3,149,049 | $1,609,530 |
PK-8 | $1,000 | $2,895,000 | $9,261 | $1,609,530 | $804,765 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0148547
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2013-2014 July 1 Estimate of General Aid Worksheet
- July 1 Estimate Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2013-14 July 1st Estimate Worksheet
2012-2013 FTE Membership Used for 2013-14 General Aid
- 2012-13 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2012-2013 Aid Calc FTE - calculation for 2013-14 General Aid.
2012-2013 Reports
Final General Aid Eligibility
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,005 | $1,105,049 | $555,356 |
UHS | $1,000 | $5,790,000 | $9,005 | $3,315,147 | $1,666,068 |
PK-8 | $1,000 | $2,895,000 | $9,005 | $1,657,573 | $833,034 |
- Deduction for Milwaukee Charter School Program for all districts: -0.013936847
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools and Racine Unified School District)
2012-2013 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2012-13 Final General Aid Worksheet
2011-12 FTE Membership Used for 2012-13 General Aid
- 2011-12 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2011-2012 Aid Calc FTE - calculation for 2012-13 General Aid.
2012-2013 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2012-13 Aid Adjustments are added to or subtracted from your district’s 2013-14 September equalization aid payment (payment date is September 16, 2013) and will be incorporated into the October 15, 2013 Certification of 2013-14 General Aid. The adjustments are considered 2013-14 revenue.
October 15 Aid Certification
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,005 | $1,105,090 | $555,356 |
UHS | $1,000 | $5,790,000 | $9,005 | $3,315,270 | $1,666,068 |
PK-8 | $1,000 | $2,895,000 | $9,005 | $1,657,635 | $833,034 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0139368530
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools and Racine Unified School District)
2012-2013 October 15 Aid Certification
- October 15 Aid Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 12-13 October 15 Aid Certification Worksheets
2011-2012 FTE Membership Used for 2012-13 General Aid
- 2011-12 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2011-2012 Aid Calc FTE - calculation for 2012-13 General Aid.
July 1 Estimate
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,222 | $1,072,395 | $555,348 |
UHS | $1,000 | $5,790,000 | $9,222 | $3,217,185 | $1,666,044 |
PK-8 | $1,000 | $2,895,000 | $9,222 | $1,608,592 | $833,022 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0144800810
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools and Racine Unified School District)
2012-2013 July 1 Estimate
- July 1 Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 12-13 July 1 Estimate Worksheets
2011-2012 FTE Membership Used for 2012-13 General Aid
- 2011-12 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2011-2012 Aid Calc FTE - calculation for 2012-13 General Aid.
2011-2012 Reports
Final General Aid Eligibility
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,498 | $968,209 | $564,023 |
UHS | $1,000 | $5,790,000 | $9,498 | $2,904,627 | $1,692,069 |
PK-8 | $1,000 | $2,895,000 | $9,498 | $1,452,313 | $846,034 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0128221788
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools and Racine Unified School District)
2011-2012 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 2011-12 Final General Aid Worksheet
2010-2011 FTE Membership Used for 2011-12 General Aid
- 2010-11 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2010-2011 Aid Calc FTE - calculation for 2011-12 General Aid.
2011-2012 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2011-12 Aid Adjustments are added to or subtracted from your district’s 2012-13 September equalization aid payment (payment date is September 17, 2012) and will be incorporated into the October 15, 2012 Certification of 2012-13 General Aid. The adjustments are considered 2012-13 revenue.
October 15 Certification
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,496 | $968,337 | $564,023 |
UHS | $1,000 | $5,790,000 | $9,496 | $2,905,011 | $1,692,069 |
PK-8 | $1,000 | $2,895,000 | $9,496 | $1,452,505 | $846,034 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0128221814
- No deduction for Milwaukee/Racine Parental School Choice Program (except Milwaukee Public Schools and Racine Unified School District)
2011-2012 October 15 Certification
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 11-12 October 15 Certification Worksheets
2010-2011 FTE Membership Used for 2011-12 General Aid
- 2010-11 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2010-2011 Aid Calc FTE - calculation for 2011-12 General Aid.
July 1 Estimate
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,653 | $948,135 | $564,032 |
UHS | $1,000 | $5,790,000 | $9,653 | $2,844,405 | $1,692,096 |
PK-8 | $1,000 | $2,895,000 | $9,653 | $1,422,202 | $846,048 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0144640321
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2011-2012 July 1 Estimate
- July 1 Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 11-12 July 1 Estimate Worksheets
2010-2011 FTE Membership Used for 2011-12 General Aid
- 2010-11 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2010-2011 Aid Calc FTE - calculation for 2011-12 General Aid.
2010-2011 Reports
Final General Aid Eligibility
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,299 | $1,243,710 | $581,087 |
UHS | $1,000 | $5,790,000 | $9,299 | $3,731,130 | $1,743,261 |
PK-8 | $1,000 | $2,895,000 | $9,299 | $1,865,565 | $871,630 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0123151192
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2010-2011 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 10-11 Final General Aid Worksheets
2009-2010 FTE Membership Used for 2010-11 General Aid
- 2009-10 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2009-2010 Aid Calc FTE - calculation for 2010-11 General Aid.
2010-2011 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2010-11 Aid Adjustments are added to or subtracted from your district’s 2011-12 September equalization aid payment (payment date is September 20) and will be incorporated into the October 15, 2011 Certification of 2011-12 General Aid. The adjustments are considered 2011-12 revenue.
October 15 Certification
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,298 | $1,243,890 | $581,087 |
UHS | $1,000 | $5,790,000 | $9,298 | $3,731,670 | $1,743,261 |
PK-8 | $1,000 | $2,895,000 | $9,298 | $1,865,835 | $871,630 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0123151253
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2010-2011 October 15 Certification
- October 15 Certification Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 10-11 October 15 Certification Worksheets
2009-10 FTE Membership Used for 2010-11 General Aid
- 2009-10 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2009-2010 Aid Calc FTE - calculation for 2010-11 General Aid.
July 1 Estimate
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,491 | $1,207,602 | $581,115 |
UHS | $1,000 | $5,790,000 | $9,491 | $3,622,806 | $1,743,345 |
PK-8 | $1,000 | $2,895,000 | $9,491 | $1,811,403 | $871,672 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0120278815
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2010-2011 July 1 Estimate
- July 1 Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 10-11 July 1 Estimate Worksheets
2009-2010 FTE Membership Used for 2011-12 General Aid
- 2009-10 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2009-2010 Aid Calc FTE - calculation for 2010-11 General Aid.
2009-2010 Reports
Final General and Eligibility
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,206 | $1,255,691 | $582,588 |
UHS | $1,000 | $5,790,000 | $9,206 | $3,767,073 | $1,747,764 |
PK-8 | $1,000 | $2,895,000 | $9,206 | $1,883,536 | $873,882 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0106806884
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2009-2010 Final General Aid Eligibility Worksheet
- Final General Aid Eligibility Worksheet - One Excel file contains all districts. Use the pull-down menu to select district.
- Explanation of Lines H & I on the 09-10 Final General Aid Worksheets
2008-2009 FTE Membership Used for 2009-10 General Aid
- 2008-09 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2008-2009 Aid Calc FTE - calculation for 2009-10 General Aid.
2009-2010 General Aid Eligibility Adjustments Summary
- Final General Aid Adjustments Worksheet - One Excel file contains all districts. Use the pull-down menu to select district. By statute, 2009-10 Aid Adjustments are added to or subtracted from your district’s 2010-11 September equalization aid payment (payment date is September 20) and will be incorporated into your October 15, 2010 estimate of 2010-11 General Aid. The adjustments are considered 2010-11 revenue.
October 15 General Aid Certification
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,205 | $1,255,824 | $582,588 |
UHS | $1,000 | $5,790,000 | $9,205 | $3,767,472 | $1,747,764 |
PK-8 | $1,000 | $2,895,000 | $9,205 | $1,883,736 | $873,882 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0106806847
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2009-2010 October 15 General Aid Certification Worksheet
- October 15 General Aid Certification Worksheets - One Excel file contains all districts. Use the pull-down menu to select district.
2008-2009 FTE Membership Used for 2009-10 General Aid
- 2008-09 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2008-2009 Aid Calc FTE - calculation for 2009-10 General Aid.
September Estimate-Data Check
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,205 | $1,255,722 | $582,589 |
UHS | $1,000 | $5,790,000 | $9,205 | $3,767,166 | $1,747,767 |
PK-8 | $1,000 | $2,895,000 | $9,205 | $1,883,583 | $873,883 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0110313828
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2009-2010 September General Aid Estimate - Data Check Worksheets
- September General Aid Estimate - Data Check Worksheets - One Excel file contains all districts. Use the pull-down menu to select district.
2008-2009 FTE Membership Used for 2009-10 General Aid
- 2008-09 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2008-2009 Aid Calc FTE - calculation for 2009-10 General Aid.
July 1 Estimate
State cost ceilings and guarantees.
Primary Cost Ceiling | Primary Guarantee | Secondary Cost Ceiling | Secondary Guarantee | Tertiary Guarantee | |
---|---|---|---|---|---|
PK-12 | $1,000 | $1,930,000 | $9,345 | $1,226,260 | $582,608 |
UHS | $1,000 | $5,790,000 | $9,345 | $3,678,780 | $1,747,824 |
PK-8 | $1,000 | $2,895,000 | $9,345 | $1,839,390 | $873,912 |
- Deduction for Milwaukee Charter School Program for all districts: -0.0110278750
- No deduction for Milwaukee Parental School Choice Program (except Milwaukee Public Schools)
2009-2010 July 1 General Aid Estimate Worksheets
- July 1 General Aid Estimate Worksheets - One Excel file contains all districts. Use the pull-down menu to select district.
2008-2009 FTE Membership Used for 2009-10 General Aid
- 2008-09 FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2008-2009 Aid Calc FTE - calculation for 2009-10 General Aid.
2008-2009 Reports
Final General Aid Worksheets
Aid FTE (Membership)
- 2008-09 Aid FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2007-2008 Aid Calc FTE.
Final General Aid Worksheets - Adjustments
October 15 General Aid Certification Worksheets
October 15 General Aid Certification FTE Report (Membership)
- 2008-09 October 15 General Aid Certification FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2007-2008 Aid Calc FTE.
July 1, 2008-2009 General Aid Estimate Worksheets
July 1 General Aid Estimate Worksheets - Aid FTE (Membership)
- 2008-09 Aid FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2007-2008 Aid Calc FTE.
2007-2008 Reports
Final General Aid Worksheets
Aid FTE (Membership)
- 2007-08 Aid FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2006-2007 Aid Calc FTE.
2007-08 Final General Aid Worksheets - Adjustments
October 15 General Aid Certification Worksheets
October 15 General Aid Certification FTE Report (Membership)
- 2007-08 October 15 General Aid Certification FTE Report - This link will take you to the SAFR portal. Once there, select a district, click on FTE Reports and select FY 2006-2007 Aid Calc FTE.